Bellevue Bathroom Remodel
The original bath was dark, cramped, outdated and leaky. The first goal of the bathroom remodel was to fix leaks (of course) and Potter Construction added a skylight in the master bath. Light and creamy marble was used in all three bathrooms to tile the shower and tub surrounds and countertops, since the polished stone reflects light and significantly brightened the bath. New cherry cabinets were installed as were water-efficient toilets and new fixtures.